PROJECTS
Casa Al Alia
High end top state of the art luxury palace with full MEP services designed & built to meet higher level of comfort, ease of operation with full care to privacy, indoor air quality & energy efficient systems.
Al Ghayati Hospital
HVAC system designed to meet ultimate level of hygienic clean areas according to ASHRAE, international standards & local codes. Operation theaters with special high efficiency filtration & positive pressure were considered for all types of surgery operations no matter the sophistication & precision required for such cases.
LIV & SOL Towers
MEP works for this quality assured type of building apartments has been designed with very careful attention & close eye on satisfactory finishing aspects with full consideration to running consumption for building common areas.
Abdel Rahim Al Ali villa Compound
MEP works were designed to assure ease of use, cost effectiveness, longer life & cost effectiveness of all installed systems.